Huanyu Parking
Car Turntable Manufacturer for Residential and Commercial Projects

Car turntable product line

Car Turntable Manufacturer for Residential and Commercial Projects

Huanyu manufactures CTA pit-mounted and CTB pitless car turntables. Send the largest vehicle, usable space, floor or pit condition, voltage, destination and site photos for an engineering review.

Send vehicle and site details on WhatsApp

Quick Project Review

Start with the facts you already know

Name, country, application and one reply channel are enough to start. Vehicle, site and installation details can be added now or in the follow-up.

Submit now if you only know the application and country. We can ask for dimensions, drawings and site photos in the reply. Please leave either email or WhatsApp / phone so the sales team can contact you.

Optional project details

Quick facts

Car turntable key facts

This page summarizes the main Huanyu car turntable offer for early buyer comparison before model selection and quotation.

Primary product
Custom car turntable / vehicle turntable
Installation types
Pit-mounted CTA and pitless CTB
Diameter range
3.5 m to 6.5 m by project type
Rated load
3000 kg to 5000 kg depending on model
Applications
Driveways, garages, showrooms and 360 photography
Quote basis
Site size, vehicle weight, installation type and destination

Direct answer

What is a car turntable?

A car turntable, also called a vehicle turntable, is a motorized rotating platform that turns a vehicle in place. It can let the driver leave in a forward direction when a driveway, garage, basement entrance or showroom does not provide enough room for a normal turning path.

It is most useful where the vehicle can reach the platform but maneuvering space is constrained. The practical choice still depends on the largest vehicle, clear entrance, approach and exit direction, available floor or pit condition, rated load, power supply and destination requirements.

A platform diameter alone is not a complete specification. Send the vehicle details and a simple site plan so the usable turning envelope and installation structure can be reviewed together.

Site suitability

Decide whether the site works before choosing a model

A useful first review connects the largest vehicle to the real approach, opening, floor condition and local-work boundary. It does not begin with diameter alone.

  1. 01

    Start with the largest vehicle

    Record the vehicle envelope, wheelbase and weight before choosing a planning diameter or rated load.

  2. 02

    Check how the vehicle reaches the platform

    Review the approach, entry direction, gate or door opening, clearances and usable turning space together.

  3. 03

    Confirm the floor or pit route

    Identify the finished-floor condition, pit feasibility, drainage and cable route before selecting CTA or CTB.

  4. 04

    Name the project interfaces

    Confirm the available power and who will handle local civil work, unloading, installation and electrical connection.

CTA or CTB

Choose the installation direction from the floor condition

CTA is the pit-mounted direction for a prepared pit and flush floor. CTB is the surface-mounted direction for an existing finished floor or retrofit; its ramp and approach path still require space review.

Project roles

Give each project participant a clear next step

The same turntable decision affects layout, civil work, electrical work, receiving and daily operation. These routes keep each role focused on the information it owns.

Architect

Define the space and interfaces

Use the installation-planning resource to record the vehicle, turning envelope, opening, pit or floor condition, drainage, cable route and local-work boundary.

Review installation planning

Contractor

Confirm the governing drawings

Check the approved project revision, civil and electrical interfaces, unloading route and responsibilities before permanent site work begins.

Review document scope

Homeowner or operator

Describe the vehicle and daily access

Send the largest vehicle, usable space, entry direction and floor condition. The engineering review can then advise the planning route without asking you to guess a diameter.

Start an engineering review

Manufacturer evidence

What buyers can verify before placing an order

Huanyu supports project review with public workshop, functional-check and export-packing references. Final configuration, testing and document scope are confirmed against the selected model and contract.

Huanyu workshop assembly reference for a car turntable platform

Workshop assembly reference

Public workshop media shows the platform and frame during assembly before the selected unit moves to export packing.

Huanyu workshop functional test reference for a vehicle turntable

Functional-check reference

Workshop media gives buyers a visible reference for rotation and control checks. Final test scope follows the selected model and order documents.

Steel-reinforced wooden crate packing for an export car turntable

Export packing reference

Packing records can be reviewed with drawing, manual and remote-support requirements before shipment.

Evidence chain

Ask for proof at three project gates

A factory photo proves that equipment exists. A usable supplier review also connects the selected machine to its current drawings, checks, packing and site handover.

Check certificate and document scope
  1. 01

    Before production: fix the project basis

    Confirm the selected structure, planning diameter and load, finish, voltage, destination and support boundary in the quotation and applicable project drawings.

    Evidence to request: Quotation scope, approved drawing revision and named project inputs

  2. 02

    Before shipment: match equipment, checks and packing

    Review the applicable assembly or functional-check record, packing scope, included modules and accessories, plus the installation documents needed by the receiving team.

    Evidence to request: Check record, packing list or photos, manuals and receiving information

  3. 03

    At handover: record what was accepted

    Keep the drawing revision, installation leads, controlled trial-run result and open items together. The project manual and qualified local team govern site work.

    Evidence to request: Handover record, trial-run result and outstanding-item list

Supplier verification

Verify the project scope before comparing quotations

Workshop and packing photos are useful evidence, but they do not replace project-specific documents. A reliable comparison checks the machine, drawings, delivery boundary and support terms together.

  1. Match the proposal to the vehicle and site

    The quotation should identify the installation type, planning diameter and load, finish, voltage, destination and support scope instead of naming diameter alone.

  2. Confirm which drawing governs the site work

    Before pit, conduit, drainage or permanent fixing begins, ask which approved project, civil and electrical drawings apply to the selected configuration.

  3. Separate packing from delivery responsibility

    Confirm the packing scope, included modules and accessories, trade term, unloading responsibility and any assembly that remains for the site team.

  4. Name the installation and handover boundary

    Record who handles local civil work, mechanical installation, electrical connection, the applicable test steps and final site safety review.

  5. Put warranty and after-sales scope in writing

    Ask the quotation, PI or contract to state the warranty period, covered items, exclusions, remote or on-site support, spare-parts route and service contact.

Engineering review

Select the model from the site and vehicle, not diameter alone

Platform diameter is only one input. Access width, wheelbase, floor or pit condition, load, voltage and installation scope can change the recommended CTA or CTB configuration.

Send these details for an initial recommendation

  • Largest vehicle model, wheelbase or vehicle size sheet
  • Usable width, depth and preferred platform diameter
  • Finished floor condition or planned pit and drainage
  • Project voltage and preferred control method
  • Destination country, trade term and installation support scope
  • Site drawings and clear access or garage photos

Responsibility boundary

Put every project handoff in writing

The exact boundary follows the quotation or contract. Use these headings to make sure equipment, local work and shared approvals are assigned before production and site work proceed.

Supplier scope to confirm

  • Selected structure and applicable project drawing revision
  • Included equipment, accessories, packing and document scope
  • Remote or on-site support included in the quotation or contract

Site-team scope to confirm

  • Vehicle and site measurements, access and finished-floor information
  • Local civil work, drainage, unloading and mechanical installation
  • Local electrical connection and final site safety review

Shared approval points

  • Drawing revisions and civil or electrical interfaces
  • Packing, transport, unloading and installation handoffs
  • Applicable test steps, handover record and open-item list

FAQ

Questions buyers usually ask before quoting

How is a car turntable diameter selected?

Start with the largest vehicle, wheelbase, entry direction, opening clearances and usable turning envelope. A diameter should be reviewed with the site rather than selected as a stand-alone number.

What is the planning difference between CTA and CTB?

CTA is the pit-mounted direction for a prepared pit and a flush finished-floor result. CTB is the surface-mounted direction for an existing finished floor or retrofit, but the ramp, approach path and surrounding clearance still need review.

What information is needed for a project quotation?

Send the largest vehicle, usable space, preferred installation direction, floor or pit condition, available power, destination and required support scope. Site drawings and access photos are useful when available.

Who handles civil work, electrical work and installation?

The boundary must be written into the quotation or contract. Local civil work, drainage, unloading, mechanical installation and electrical connection should each have a named responsible party before site work begins.

Which drawings should the site team follow?

Only the approved project revision for the selected configuration should govern pit, conduit, drainage or permanent fixing work. General web information is for early planning, not a construction release.

Project quotation

Need a car turntable for a specific site?

Send the diameter, vehicle weight, installation type and destination country. Huanyu will prepare a project-based quotation.

Request a Quote