Architect
Define the space and interfaces
Use the installation-planning resource to record the vehicle, turning envelope, opening, pit or floor condition, drainage, cable route and local-work boundary.
Review installation planning
Car turntable product line
Huanyu manufactures CTA pit-mounted and CTB pitless car turntables. Send the largest vehicle, usable space, floor or pit condition, voltage, destination and site photos for an engineering review.
Send vehicle and site details on WhatsAppQuick Project Review
Name, country, application and one reply channel are enough to start. Vehicle, site and installation details can be added now or in the follow-up.
Quick facts
This page summarizes the main Huanyu car turntable offer for early buyer comparison before model selection and quotation.
Direct answer
A car turntable, also called a vehicle turntable, is a motorized rotating platform that turns a vehicle in place. It can let the driver leave in a forward direction when a driveway, garage, basement entrance or showroom does not provide enough room for a normal turning path.
It is most useful where the vehicle can reach the platform but maneuvering space is constrained. The practical choice still depends on the largest vehicle, clear entrance, approach and exit direction, available floor or pit condition, rated load, power supply and destination requirements.
A platform diameter alone is not a complete specification. Send the vehicle details and a simple site plan so the usable turning envelope and installation structure can be reviewed together.
Site suitability
A useful first review connects the largest vehicle to the real approach, opening, floor condition and local-work boundary. It does not begin with diameter alone.
01
Record the vehicle envelope, wheelbase and weight before choosing a planning diameter or rated load.
02
Review the approach, entry direction, gate or door opening, clearances and usable turning space together.
03
Identify the finished-floor condition, pit feasibility, drainage and cable route before selecting CTA or CTB.
04
Confirm the available power and who will handle local civil work, unloading, installation and electrical connection.
CTA or CTB
CTA is the pit-mounted direction for a prepared pit and flush floor. CTB is the surface-mounted direction for an existing finished floor or retrofit; its ramp and approach path still require space review.
Project roles
The same turntable decision affects layout, civil work, electrical work, receiving and daily operation. These routes keep each role focused on the information it owns.
Architect
Use the installation-planning resource to record the vehicle, turning envelope, opening, pit or floor condition, drainage, cable route and local-work boundary.
Review installation planningContractor
Check the approved project revision, civil and electrical interfaces, unloading route and responsibilities before permanent site work begins.
Review document scopeHomeowner or operator
Send the largest vehicle, usable space, entry direction and floor condition. The engineering review can then advise the planning route without asking you to guess a diameter.
Start an engineering reviewEngineering resources
These resources support early coordination. Approved project documents for the selected configuration must govern construction and handover.
Pit, floor, drainage, conduit and site-interface questions to settle before construction.
Use the catalog to compare available product families; the final selection still follows the vehicle and site review.
Review which available documents apply to the selected model and contract instead of assuming blanket coverage.
Send the vehicle, usable space, floor or pit condition, power and destination needed for a project-based review.
Manufacturer evidence
Huanyu supports project review with public workshop, functional-check and export-packing references. Final configuration, testing and document scope are confirmed against the selected model and contract.

Public workshop media shows the platform and frame during assembly before the selected unit moves to export packing.

Workshop media gives buyers a visible reference for rotation and control checks. Final test scope follows the selected model and order documents.

Packing records can be reviewed with drawing, manual and remote-support requirements before shipment.
Evidence chain
A factory photo proves that equipment exists. A usable supplier review also connects the selected machine to its current drawings, checks, packing and site handover.
Check certificate and document scopeConfirm the selected structure, planning diameter and load, finish, voltage, destination and support boundary in the quotation and applicable project drawings.
Evidence to request: Quotation scope, approved drawing revision and named project inputs
Review the applicable assembly or functional-check record, packing scope, included modules and accessories, plus the installation documents needed by the receiving team.
Evidence to request: Check record, packing list or photos, manuals and receiving information
Keep the drawing revision, installation leads, controlled trial-run result and open items together. The project manual and qualified local team govern site work.
Evidence to request: Handover record, trial-run result and outstanding-item list
Supplier verification
Workshop and packing photos are useful evidence, but they do not replace project-specific documents. A reliable comparison checks the machine, drawings, delivery boundary and support terms together.
The quotation should identify the installation type, planning diameter and load, finish, voltage, destination and support scope instead of naming diameter alone.
Before pit, conduit, drainage or permanent fixing begins, ask which approved project, civil and electrical drawings apply to the selected configuration.
Confirm the packing scope, included modules and accessories, trade term, unloading responsibility and any assembly that remains for the site team.
Record who handles local civil work, mechanical installation, electrical connection, the applicable test steps and final site safety review.
Ask the quotation, PI or contract to state the warranty period, covered items, exclusions, remote or on-site support, spare-parts route and service contact.
Engineering review
Platform diameter is only one input. Access width, wheelbase, floor or pit condition, load, voltage and installation scope can change the recommended CTA or CTB configuration.
Applications
Each use case has different space, finish and installation requirements.
Help vehicles enter and exit forward in villas, tight residential driveways and private garages.
A practical turning solution for home garages, basement parking and renovation projects.
Display vehicles from every angle in dealerships, exhibitions and premium retail spaces.
Support controlled vehicle rotation for consistent photo and video capture workflows.
Responsibility boundary
The exact boundary follows the quotation or contract. Use these headings to make sure equipment, local work and shared approvals are assigned before production and site work proceed.
FAQ
Start with the largest vehicle, wheelbase, entry direction, opening clearances and usable turning envelope. A diameter should be reviewed with the site rather than selected as a stand-alone number.
CTA is the pit-mounted direction for a prepared pit and a flush finished-floor result. CTB is the surface-mounted direction for an existing finished floor or retrofit, but the ramp, approach path and surrounding clearance still need review.
Send the largest vehicle, usable space, preferred installation direction, floor or pit condition, available power, destination and required support scope. Site drawings and access photos are useful when available.
The boundary must be written into the quotation or contract. Local civil work, drainage, unloading, mechanical installation and electrical connection should each have a named responsible party before site work begins.
Only the approved project revision for the selected configuration should govern pit, conduit, drainage or permanent fixing work. General web information is for early planning, not a construction release.
Project quotation
Send the diameter, vehicle weight, installation type and destination country. Huanyu will prepare a project-based quotation.